Credit for the pic to Terrance ‘Bear’ Ruttan of Deep Water Recovery from his facebook page in Aug. 2022 but he changed it and removed all his pics. That’s okay, I saved them. 🙂

DWR lawyers are on the run trying to throw up more legal roadblocks again. I guess you can’t blame them not wanting this guy to be examined. Still waiting for them to offer a time when Terrance Ruttan is available. 🙂

These guys know they are going to lose. I have proof – they have this from Ruttan. If they had a case they wouldn’t be pulling the crap they are, they’d want to get me into court and have me dealt with instead of still sending their thugs to find and harass me.

They aren’t doing themselves any favours by their attempts to circumvent the Protection of Public Participation Act. Judges can order 100% costs if it’s decided this case was in fact an attempt to prevent me from exercising my rights under the PPP Act.

What ‘Property’ was I on June 22, 2022? The same road that had a Bakery business operating with the public accessing it. If the road is DWR property – where are the signs indicating it? Only sign is by the gate at the railway crossing. You lose – again.

Ya Terrance, the drone is so noisy it must prevent one worker from hearing the other one tell him to stop working to look at the drone. How far away is it? Is that 30 to 100 feet? What medication is Terrance taking to prevent his anxiety when he hears all those noises in the industrial site? Is 5 to 15 minutes between noon and 2 pm constant surveillance?

This is DWR’s counterclaim.