Thug Jurisich lies so much he doesn’t keep track from one day to the next – just answers whatever suits the situation – doesn’t have to be the truth.

“A dry dock doesn’t make any difference [to] how you do it. A dry dock is no different than a paved surface. So what’s important is containment, that you contain everything that you’re doing,” he said. 

https://thediscourse.ca/comox-valley/international-ngo-calls-for-a-halt-to-shipbreaking-operation-in-union-bay

Mark Jurisich, director of DWR, told The Discourse in an email on May 8, 2024 that what appears to be occurring to the barge in a video is maintenance work, and not ship dismantling. 

“What you are actually looking at is the maintenance work that we have been doing recently.  These barges were not being recycled or dismantled. The work also included the removal of the metal/timber side walls so that the barges could be repurposed,” he said. 

https://thediscourse.ca/comox-valley/international-ngo-calls-for-a-halt-to-shipbreaking-operation-in-union-bay

The May 8 video shows the barge being dismantled and truth challenged Jurisich claims it’s not – that’s what Jurisich does, even with proof he claims it’s not happening. Don’t believe your lying eyes. It’s the very barge shown below.

Jurisich shows how important ‘containment’ is at his filthy facility.

LinkedIn