Thought it would be interesting to see if there’s any movement by the Ministry – oh wait – you can’t check because the site is down until the end of April 2025.

The only item complied with is the filtration system which is limited to runoff from the paved asphalt. It’s apparent the runoff from the upper green barge is intentionally directed to the soil by the trench DWR dug.