Got behind in my posting – trying to catch up.

Why did they dig a trench to the soil and then cover it up?

Late 2023. Liquid always flows from under upper green barge. Note concrete blocks and flow of liquid.
November 2023.
February 2024.
February 24, 2024. Blocks removed.
March 18, 2024.
March 28, 2024. Trench dug directing liquid from the asphalt onto bare soil.
March 29, 2024. Filling in the hole where the concrete blocks were.
March 30, 2024. Filled in.
April 2, 2024.
April 11, 2024. Starting to pile stuff on trench.
April 23, 2024. More stuff
August 1, 2024.
October 3, 2024.
October 28, 2024.
January 7, 2025.
March 15, 2025.
May 29, 2025.
June 22, 2025.
August 18, 2025.
September 22, 2025. Ditch runs along the top of the property – no idea where it drains but the area in the upper right of the Miller Freeman always has liquid in it.