Water Pressure Required for Kensington Island Properties aka Union Bay Estates Development at 94 m.

Did the KIP board consider future requirements when accepting the 4 acres to build a water treatment facility at the same elevation as the old waterworks?

KIP’s own consultants stated in order to service parts of KIP’s development at 94 m will require UBID’s water pressure to be a minimum HGL (hydraulic grade line) of 130. The old waterworks was HGL of 75 m.

So what is UBID’s HGL now with the new reservoir? Wanna bet it’s not 130?

This report is from 2008. A lot has changed since that time but pressure and HGL have not.

2 thoughts on “Water Pressure Required for Kensington Island Properties aka Union Bay Estates Development at 94 m.

Add yours

  1. See you are still fighting the battle,
    Good luck you are dealing with real slimy suckers!
    Alex

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

Up ↑

%d bloggers like this: