Ole slick likes reports. Here’s one on the great wastewater treatment systems from his fav at the time, Focus. https://allthingsunionbay.com/2018/01/16/if-kensington-island-properties-aka-34083-yukon-inc-is-going-ahead-wastewater-treatment-facility-must-be-built/

Is the area below going to be used for the wastewater treatment plant and those ponds used for holding the treated waste until Oct. to start dumping daily?

Plan is to dump 1000 cubic metres of treated sewage DAILY into Hart/Washer Creek Oct. through May. KIP pipe visible half way down on the left by the blue stripe.



Image below is from KIP’s original sewage application (1875 cubic metres of treated sewage daily) – the location of the WWTP appears to be located up by the log home and near where the new Fire Hall is supposed to go. Ole slick could have changed the location since 2018.

Page 17 of the MDA. Ole slick’s word is worthless.