When I noticed the installation of the pipe when the site was prepared for the mobile trailer in April 2025, I didn’t understand the purpose of it until I flew over adjacent Glover Park Jan. 30, 2026, to follow the flow from the culvert and how it flowed into the flat area of the park and eventually drains into the watercourse running along the north boundary of DWR out to the ocean.
April 21, 2025
April 21, 2025. No pipe.
April 22, 2025. Pipe visible protruding into trench.
I didn’t notice the outfall pipe at the time, but going back through the pictures you can clearly see the pipe near the stumps.
Dec. 5, 2024. Trench dug to ensure flow from watercourse is diverted to pipe installed for mobile trailer.
Dec. 5, 2024. The culvert runs under the roadway and into Glover Park, but admitted thief Jurisich decided to divert it to flush whatever crap he’s dumping into the marine environment with those pipes.